7
Installation
7.2
Earthing
7.2.1
Earthing points
There are labelled earthing points on the handling system for earthing.
Note
Observe national regulations.
Pay attention to installation of the earthing cables in energy chains
(è 7.3 Cables and hoses).
Place cable lugs of the earthing cables between serrated washer and washer.
Tighten nut or bolt (tightening torque 4 Nm).
Festo – GDCP-YXC-EN – 1502NH – English
71