Figure 2-2
No.
Step
6
Configure network settings on PG/PC
7
Set up further user accounts
8
Install software and updates
9
Configure the system
10
Create a disk image (backup).
PCU Base Software (IM10)
Commissioning Manual, 12/2017, 6FC5397-1DP40-6BA1
Example sequence of first commissioning (continued)
Description
Once you have networked the PCU, a PG/PC and any other devices with one another,
configure the network settings of your PG/PC (Page 141).
Before you install software, at least one user account with limited rights must be set up
(Page 30).
Install necessary automation software and Windows updates (Page 95).
Configure the installed software (Page 95), Windows 7 and other system properties
(Page 29) and, if necessary, the SITOP UPS module (Page 52).
Create a disk image of the SSD as a backup (Page 121) to be able to return to this version
in a maintenance situation.
First commissioning of the PCU 50.5
2.1 Overview
17