Figure 18: Physical service processor ports, HPE ProLiant DL360 Gen10 Server
1
Management (MGMT) port; NIC 1
2
Service port; NIC 2
2. Connect and secure the cable for the power connection.
Power connection—Connect a power cable to a power source, but do not turn on the power yet.
For dual power supplies, connect power cables to both power supplies and each to an independent
power source.

Cabling the controller nodes: Process overview

IMPORTANT: Do not turn on power to the components at this time. Connect the power cables and
keep the power off until you power on the components.
IMPORTANT: To enable access to components for servicing, neatly route and secure the cables
along the sides of the rack.
Procedure
1. Complete Cabling for the management connection on page 28.
2. Complete Cabling for the host connection on page 29.
3. Complete Cabling for the Remote Copy connection (optional feature) on page 31.
4. Complete Cabling for the File Persona connection (optional feature) on page 31.

Cabling for the management connection

Procedure
Connect a CAT-5e or Cat 6 Ethernet cable between the onboard MGMT port on each controller node
and the network. At the rack rear, neatly route and secure the cables along the right side of the rack.
Each controller node supports one Ethernet connection to a switch or hub. Separate connections from
the Ethernet switch or hub to at least two controller nodes are required to support redundancy. One IP
address is shared between the two connections, and only one network connection is active at a time. If
the active network connection fails, the IP address is automatically moved to the surviving network
connection.