Procedure
Review the specific information concerning server-room environments and for input electrical power and
grounding requirements in the HPE 3PAR StoreServ 9000 Storage Site Planning Manual available at the
Hewlett Packard Enterprise Information Library website: www.hpe.com/info/storage/docs
Customer Self Install videos
The HPE 3PAR StoreServ 9000 Storage Customer Self Install (CSI) videos are available at the HPE
3PAR StoreServ 9000 Storage Customer Self Install Video website:
www.hpe.com/support/3PAR9000CSIVideo
NOTE: The video may take a minute to load.
Acclimatizing
CAUTION: To prevent potential damage to storage system hardware, do not power on the storage
system until it is fully acclimatized. The maximum acceptable rate of temperature change for a
nonoperating storage system is 36° F/hour (20° C/hour). If the storage system or its components
have experienced environmental changes during transit, allow enough time for the storage system
to acclimatize before proceeding with the power-on sequence.
Before powering on the HPE 3PAR StoreServ 9000 Storage system, the storage system might require up
to 24 hours to acclimatize to the new operating environment when outside-to-inside conditions vary
significantly.
Procedure
If condensation is present even after the 24-hour acclimatization period, wait for all condensation to fully
evaporate before completing the power-on sequence.
Tools for the installation
Table 1: Tools for the installation
Purpose
Safety
Rack unpacking
Physical Service
Processor (SP)
connection setup
Tools
•
ESD mat
•
ESD grounding strap
•
Scissors or snips
•
Box cutter
•
Socket wrench with 13 mm (1/2 in) and 17 mm (11/16 in) sockets for
removing L-bracket shipping clamps
•
Adjustable wrench for leveling feet on the rack
Laptop for configuration of a physical Service Processor
Preparing: Process overview