Figure 3-14 Removing connecting kits
Step 8 Use a manual pallet truck to transport the power cabinet and bypass cabinet to the installation
position. Ensure that the two cabinets align with each other.
----End
3.1.8 (Optional) Combining the Power Cabinet and Bypass
Cabinet (300K-FT, 400K, 500K, 600K)
Procedure
Step 1 Reinstall the bottom, middle, and top connecting kits for the power cabinet and bypass cabinet
based on screw specifications, screw quantity, and recorded information.
Step 2 Reinstall the removed soft copper bars and battery copper bar components based on their
numbers, screw specifications, screw quantity, and recorded information.
Step 3 Reconnect the removed cables to the system signal interface board in the power cabinet, and
bind the cables based on the recorded information.
Step 4 Check that the power cabinet and bypass cabinet are combined completely and securely.
Step 5 After checking that cabinets are combined properly, reinstall the side covers and rear covers.
----End