Overview
Model
UPS5000-A-400K-FTS
Dimensions
2000 mm x 1200 mm x 850 mm
(H x W x D)
1. Before installation, read the user manual carefully to get familiar with product information
and safety precautions.
2. Use insulated tools during installation and operations.
3. Only engineers certified by the Company or its agents are allowed to install, commission, and
maintain the UPS. Otherwise, personal injury or device damage may occur, and the UPS faults
caused are beyond the warranty scope.
UPS5000-A-400K-FTS
(1) Power units
(5) Power distribution unit
(PDU) cover
UPS5000-A-500K-FTS
(2) Control unit
(6) Maintenance bypass switch
1
UPS5000-A-600K-FTS
2000 mm x 1400 mm x
850 mm
UPS5000-A-500K-FTS
(3) Mains input switch
(7) Bypass input switch
Copyright © Huawei Technologies Co., Ltd. 2022.
All rights reserved.
(4) Output switch
(8) Bypass unit

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-A-400K-FTS

  • Page 1 (1) Power units (2) Control unit (3) Mains input switch (4) Output switch (5) Power distribution unit (6) Maintenance bypass switch (7) Bypass input switch (8) Bypass unit (PDU) cover Copyright © Huawei Technologies Co., Ltd. 2022. All rights reserved.
  • Page 2: Installing The Ups

    UPS5000-A-600K-FTS (1) Power units (2) Control unit (3) Mains input switch (4) Output switch (5) PDU cover (6) Maintenance bypass switch (7) Bypass input switch (8) Bypass unit Installing the UPS Determining the UPS Installation Position The UPS can be installed on the channel steel or floor. Determine the mounting hole positions using a marking-off template, drill holes, and install expansion sleeves based on site requirements.
  • Page 3 600K Hole Dimensions A: mounting holes on the channel steel B: mounting holes on the floor Unit: mm Securing the UPS Floor mounting: Secure the cabinet to the floor using eight M12x60 expansion bolts.  Channel steel mounting: Secure the cabinet to the channel steel using eight M12x60 ...
  • Page 4: Installing Cables

    Installing the Front and Rear Anchor Baffle Plates Installing Cables 1. Two power sources are used as an example. 2. If there is only one power source, the bypass input cables do not need to be connected and the interconnecting copper bars do not need to be removed. UPS Cable Connection Reference •...
  • Page 5 Installing Cables Scenario 1: Routing Cables from the Top 1. Open the front door of the bypass cabinet 2. Remove the top cover from the cabinet and remove the covers of the power based on cable routes and dimensions. distribution subrack. The UPS5000-A-400K- FTS is used as an example.
  • Page 6 M16x55 bolts are used to connect the mains input power cables, output power cables, bypass input power cables, and battery cables for the 500K and 600K cabinets. 6. Connect the output power cables. 5. Connect the mains input power cables. 8.
  • Page 7 9. Connect the signal cable. The wire routed from the middle point of positive and negative battery strings is the neutral wire. Take a battery string consisting of 40 batteries for example. The battery neutral wire is routed from the middle between positive and negative battery strings, each consisting of 20 batteries.
  • Page 8: Verifying The Installation

    Verifying the Installation 1. Check that there is no foreign matter in the cabinets. The 400 kVA model is used as an example. The procedures for 500 kVA/600 kVA models are the same. (1) Switches (2) Mains input wiring copper bar (3) Battery input wiring copper bars (4) Output wiring...
  • Page 9: Powering On And Starting The Ups

    1. If the UPS is powered on for the first time, you need to obtain the startup password from the Service Expert app. Skip this step if the UPS is not powered on for the first time. 2. The Service Expert app can be downloaded from Huawei AppGallery and can only run on Android.
  • Page 10 1. Obtain the startup password. Download and install the Service Expert app. On the app home screen, tap StartUp to access the Set Startup screen. Use the app to start the UPS online? No, start the UPS offline Insert the WiFi module into the USB port on Set Site and Device Type as required, the MDU.
  • Page 11: Starting The Inverter

    2. Set parameters such as the language, date and time, network parameters, system parameters, and battery parameters on the Settings Wizard screen. Set all battery parameters correctly based on site requirements. Assume that the battery specifications are 150 Ah/12 V, 40 batteries are connected in series, and two battery strings are connected to the UPS in parallel, Set Single battery voltage(V) to 12, Single battery capacity(Ah) to 150, Batteries in a battery string to 40, and Number of battery strings to 2.
  • Page 12 UPS and then switch off the circuit breaker for each battery string. Turn off the upstream mains and bypass input switches. Scan here for more documents: WeChat Support-E Support You can also log in to Huawei technical support website: https://support.huawei.com/enterprise https://support.huawei.com...