Step 1 Connect one end of the cable to the COM1 port on the UPS monitoring interface
card, and the other end to the COM port on the SmartLi monitoring interface unit.
Figure 3-38 Connecting a communications cable
----End

3.3 (Optional) Combining Cabinets

Procedure
Step 1 Open the front and rear doors of the UPS. Adjust the UPS height by turning the
anchor bolts using a wrench. Use a level to check the levelness.
Figure 3-39 Leveling the feet
Step 2 Remove the UPS cabinet connecting kits from the rack.