3.2.2 Installing UPS Cabinets (300K-FT, 400K, 500K, 600K, 800K)

3.2.2.1 Installing the UPS on the Floor

Context
Procedure
Step 1 Determine the cabinet installation positions on the ground based on holes in the marking-off
template for ground installation.
Figure 3-23 Hole dimensions (300K-FT, 400K, 500K, unit: mm)
Issue 03 (2019-02-15)
Ensure that the installation floor is flat.
The marking-off template is delivered with the UPS.
A: mounting holes on the channel steel
B: mounting holes on the floor