Step 3 Connect ground cables.
Figure 3-71 Ground cable connection
Step 4 Route power cables.
Issue 03 (2019-02-15)
: Internal equipotential connection
: Protection ground
Dual mains
Remove the copper bars between mains and bypass input terminals.
Figure 3-72 shows power cables routed from the bottom by removing small covers, as an
example.