UPS5000-A-(200 kVA-800 kVA)
User Manual
Issue 03 (2019-02-15)
Figure 3-77 Removing small covers from the top of the cabinet
Drill holes into the large cover for routing cables.
a.
Remove the cable cover for signal cables and small covers from the top.
b.
Remove the two large covers from the rear top of the cabinet, drill holes into them,
and install them to the positions where the small covers were placed, as shown in
Figure 3-78.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
123