UPS5000-A-(200 kVA-800 kVA)
User Manual
Figure 3-190 Positions to be checked for foreign matter (200K)
(1) Cabinet top
(4) Cabinet rear
Figure 3-191 Positions to be checked for foreign matter (300K)
(1) Cabinet top
Issue 03 (2019-02-15)
1. In the scenarios where holes are drilled for routing cables or covers are removed for routing cables,
after routing cables and checking cable connections, use sealing putty to fill in the gap between the
cables and the cabinet.
2. After verifying the installation, reinstall all the covers.
3. Do not remove the dustproof cover before power-on to prevent dust inside the UPS.