Performing A Physical Audit Of A Range Of Cells; Performing A Verified Audit Of A Range Of Cells; Meaning Of The Audit Indicator - Oracle StorageTek SL3000 Manual

Modular library system
Hide thumbs Also See for StorageTek SL3000:
Table of Contents

Advertisement

Performing a Physical Audit of a Range of Cells

Performing a Physical Audit of a Range of Cells
In SLC, select Tools > Diagnostics.
1.
Select the Library in the device tree.
2.
Click the Audit tab.
3.
Select Yes for Physical Audit (select No for Entire Library and Verified Audit).
4.
From the drop-down lists, select the internal address for the starting and ending
5.
locations of the audit.
Click Audit.
6.

Performing a Verified Audit of a Range of Cells

A verified audit validates the status of a cartridge location in the cartridge database. If
a cartridge address has a verified status of false, the library does a physical audit of
that location and updates the cartridge database.
In SLC, select Tools > Diagnostics.
1.
Select the Library in the device tree.
2.
Click the Audit tab.
3.
Select Yes for Verified Audit (select No for Entire Library and Physical Audit).
4.
From the drop-down lists, select the internal address for the starting and ending
5.
locations of the audit.
Click Audit.
6.

Meaning of the Audit Indicator

To indicate an audit is in progress, SLC displays a spinning indicator and the message
"Audit in progress". When you see this indicator, do not open the library access door.
This will cause the audit to restart.
The audit indicator only displays when an audit is initiated automatically (library
access door has been opened and closed, library power up, or restart). The indicator
does not display for audits initiated from SLC or the host.
13-2 StorageTek SL3000 Library Guide
You cannot stop a physical audit after it begins.
Note:

Advertisement

Table of Contents
loading

Table of Contents