GE Compax 40E System Service Manual page 33

Table of Contents

Advertisement

GE HEALTHCARE
REV 9
Step
D SYSTEM CONNECTIONS
DD POWER AND GROUND
CABLE CONNECTIONS
POWER WIRING CONNECTIONS
D Route Power and Ground cables
A21
D Connect cables onto MPH
2 People
DD
SYSTEM CABLES CONNECTION
SYSTEM WIRING CONNECTION
D Route remaining System cables
A22
2 People
Continues on next page
System Service Manual − SYSTEM COMPAX 40E, CE Marked
Description
From previous page
A21 − A22 = 4 Hours
with MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
Í Í Í Í
Mark each box when done
Supporting Documents
Done
Refer to Inspection Report 2179651 TDR or
2172166 TDR or 2167647 TDR, section 1.2
REMARK: Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1−4)
.
:
Connections to be done during Installation:
MIS 3, 4, 6, 9, 11
MIS 1−1, 21, 3−1, 4−1, 5−1, 6−1, 7.1
Í
See SM MPH: Dir 2137354−100
Í
Chapter 1, Job Card IST002
REMARK: Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1−4)
.
:
Connections to be done during Installation:
MIS 1, 2, 6, 7, 8, 10, 12 to 23
NOTE: For connection of DOOR OPEN switch
Í Í
and EXPOSURE ON signal lamp refer to Jov
Í Í
See Job Card IST 005 for cable clamping
22
DIRECTION 2154260−100
Card IST004 of this manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compax 40E and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Compax 40ce

Table of Contents