GE Compax 40E System Service Manual page 28

Table of Contents

Advertisement

GE HEALTHCARE
REV 9
Step
D X−Ray Tube
A5
D Collimator Head (SA/SM)
2 people
Without
D Drive Unit
A6
D Yoke
D Fulcrum Arm Support (Wall)
D Operator Control Console
2 People
System Service Manual − SYSTEM COMPAX 40E, CE Marked
Description
From previous page
INSTALLATION
A4 − A5=16 Hours
Tomo−Link
with/without
With
INSTALLATION
8 Hrs
Continues on next page
with MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
Í
Í
Supporting Documents
Done
Í Í Í Í
Í Í
Í Í
17
DIRECTION 2154260−100
Mark each box when done
Refer to Inspection Report 2179651 TDR
or 2167647 TDR, sections 2.1 and 3.1
CAUTION: X−Ray Tube and Collimator
are factory aligned and assembled during
HLA.
The mounting ring should be not be
adjusted during installation .
See Job Card IST001 of this manual for
X−Ray Tube and Collimator installation
and levelling.
Refer to Inspection Report 2179651 TDR,
section 5.1
Refer to Tomo−Link SM 2133821−100
sections 1,2,5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compax 40E and is the answer not in the manual?

This manual is also suitable for:

Compax 40ce

Table of Contents