GE Compax 40E System Service Manual page 30

Table of Contents

Advertisement

GE HEALTHCARE
REV 9
Step
A9
D Counterbalancing & Leveling
1 Person
D Collimator cable
D Lock Cable
A 10
D Column Cable concealment
1 Person
DD COMPAX 40E TABLE INSTALLATION
D Table Base Installation and leveling
A 11
D Tabletop Installation
2 People
D Table Base Longitudinal Axis Alignment with:
D XT Longitudinal Rails
A12
D (or) RS 85 Longitudinal Rails
2 People
System Service Manual − SYSTEM COMPAX 40E, CE Marked
Description
From previous page
INSTALLATION
CONNECTIONS
A7 − A10= 8 Hours
INSTALLATION
ALIGNMENT
A11 − A12 = 4 Hours
Continues on next page
with MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
Í
Mark each box when done
Í
Supporting Documents
Done
See RS 85 Mounting Instructions, SM Dir.
0327 7223. Chapter 1, Section 1.7, Chapter
2 section 2.9 and Chapter 3 sections 3.1
Í Í
thru 3.3 and 3.5.
Í Í
REMARK: Most of these cables are already
factory connected.
See RS 85 Interface Kit for Compax 40E CE;
SM Dir.2165897−100, Chapter 1 Installation,
Chapter 2 MIS MAP and Chapter 3 MIS
CHART
See Job Card IST 005 for cable clamping
See MIS MAPS, Chapter 5 of this manual, and
Í
MIS CHART in section 1-4-3 this chapter.
MIS No. 27304
See Job Card IST003 for Cable concealment
Refer to Inspection Report 2179651 TDR
or 2167647 TDR sections 4.1 and 4.3
or
Inspection Report 2172166 TDR
sections 4.1 and 4.8
Í
See SM COMPAX 40E CE, Dir. 2150299−100,
Í
Chapter 1, Section 3.
See SM COMPAX 40E CE, Dir. 2150299−100,
Chapter 1, Section 3.2
Í Í
19
DIRECTION 2154260−100
NOTE: Precise alignment is extremely
important for Tomographic Performance.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compax 40E and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Compax 40ce

Table of Contents