GE Compax 40E System Service Manual page 31

Table of Contents

Advertisement

GE HEALTHCARE
REV 9
Step
From previous page
DD WALL BUCKY INSTALLATION
without
A17
D Mounting Hardware Kit
A16
1 Person
D SG60/SG100 Installation
A17
D Vertical Leveling
D Route System Cables from SG to MPH
Cabinet location
D Lateral alignment across the wall to Table
Longitudinal Axis
2 People
System Service Manual − SYSTEM COMPAX 40E, CE Marked
Description
WALL
BUCKY
with/without
with
without
WALL
MOUNTING
KIT
with
INSTALLATION
INSTALLATION
Continues on next page
with MPH 50/65/80 (including XT, RS 85 and Tomo−Link)
Í Í
Í Í
Done
Supporting Documents
See SM Vertical Bucky Stand SG 100 CE −
Dir 2150297−100, Chapter 1 or SM Vertical
Bucky Stand SG60, Dir 2150293−100
Chapter 1.
REMARK: Use of the Wall Mounting Kit is optional
but strongly recommended with certain kinds of
Hospital wall construction (Unistrut wall). Refer to
SG60 PIM 2150301−100 or SG100 PIM 2150305−100
.
Í Í
Í Í
2 Hours
Refer to Inspection Report 2179651 TDR
or 2172166 TDR sections 6.1, 6.2 and 6.3
or
Inspection Report 2167647 TDR,
sections 5.1, 5.2 and 5.3
REMARK: Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1−4)
.
:
D
SG60: MIS 5.1
Í Í
D SG100: MIS 5.1−9
2 Hours
20
DIRECTION 2154260−100
Mark each box when done
See SG60 SM 2150293−100, Job Card IST001
or SG100 SM 2150297−100, Job Card IST001
Connections to be done during Installation:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compax 40E and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Compax 40ce

Table of Contents