4.1.3 Unpacking and Checking the Instrument

Check the equipment for completeness using the delivery note and package contents
list for the various items. Check the instrument for any damage and loose parts. If there
is any damage, immediately contact the carrier who delivered the instrument.
Packing material
Retain the original packing material. If the instrument needs to be transported or ship-
ped at a later date, you can use the material to protect the control elements and con-
nectors.
Risk of damage during transportation and shipment
Insufficient protection against mechanical and electrostatic effects during transportation
and shipment can damage the instrument.
Always ensure that sufficient mechanical and electrostatic protection are provided
When shipping an instrument, the original packaging should be used. If you do not
have the original packaging, use sufficient padding to prevent the instrument from
moving around inside the box. Pack the instrument in antistatic wrap to protect it
from electrostatic charging
Secure the instrument to prevent any movement and other mechanical effects dur-
ing transportation
Delivery package
The package contents contain the following items:
R&S NGE100B power supply preloaded with two 230 V fuses
Four power cables
Two 115 V fuses (replace the preloaded fuses with these fuses depending on the
mains voltage, see
more information)
One Getting Started manual
One document folder containing safety instructions, calibration certificate, KC and
CE certificate

4.1.4 Setting Up the Instrument

The R&S NGE100B is designed for benchtop and rackmount.
User Manual 5601.1343.02 ─ 04
Chapter 4.2.2, "Switching On the
Quick Start
Putting into Operation
Instrument",
on page 23 for
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nge103bNge102b

Table of Contents