ABB REACT-3.6-TL Product Manual page 65

From 3.6 to 4.6 kw, solar inverters
Hide thumbs Also See for REACT-3.6-TL:
Table of Contents

Advertisement

• Insert the battery pack connection
cables (which come out of the
inverter) into the REACT-BATT
using the hole present on the side
of the mechanical cover.
• Feed the cables into the cable
conduit (male) supplied with the
REACT-BATT
.
14
• Insert the cable conduit (male)
into the REACT-BATT
36
screw it into its counterpart (cable
conduit (female)
on REACT-
07
UNO
.
03
• Connect the cables to the respective counterparts on the battery pack respecting the positions:
Communication and control cable on the communication and control connector (cable from the unit on the
a
right)
.
39
Power cable on the power connector (cable from the unit on the right)
b
Ground cable on the ground connection points
c
Dangerous voltage on the terminals of the power connector. Be careful not to touch the terminals with
fingers or with uninsulated equipment
Make the connections usingpersonal protective clothing and/or equipment, such as insulating gloves.
• Proceed with installation of the REACT-MTR
14
and
14
35
44
42
J7
BATTERY ADDRESS
D1
SELECTOR
D2
J
4
D3
120
J6
J5
ON
/ I
O
C
O
M
.
L
N I
K
M
U
L
T
- I
B
A
T
T
E
R
Y
BATT. COMM.
OFF
BATT. COMM.
BUS
BUS
- 65 -
Скачано с сайта интернет магазина https://axiomplus.com.ua/
.
38
.
39
35
38
J1
PE
J
3
DC POWER
J2
/ I
O
C
O
M
.
a
MULTI-BATTERY
DC POWER LINK
5 - Installation
b
c

Advertisement

Table of Contents
loading

This manual is also suitable for:

React-4.6-tl

Table of Contents