Setting The Replenishment Rates - Kodak RP X-OMAT M6B Installation Instructions Manual

Hide thumbs Also See for RP X-OMAT M6B:
Table of Contents

Advertisement

Setting the Replenishment Rates

Refer to the manufacturer's specifications for the film and chemicals being used, for operating
temperatures and replenishment rates. The KODAK RP X-OMAT Processor Service Bulletin
No. 30 is available from your Kodak Representative or Marketing Technical Group, Health
Sciences Division, Eastman Kodak Company, Rochester, New York 14650.
Contact a qualified operator, service personnel, or authorized dealer representative to perform the
following adjustments.
[1]
Remove the RECEIVING-END ACCESS PANEL and the DRIVE SIDE ACCESS PANEL from the
processor. Run the REPLENISHMENT PUMP to purge air from the system.
[2]
With the 2 GRADUATED CYLINDERS under the REPLENISHMENT CHECK TUBES, turn the VALVES
on and press the ''REPL'' SWITCH. See Figure 39 on page 39, if necessary. Run the PUMP to purge
air from the system.
[3]
With the GRADUATED CYLINDER under the DEVELOPER CHECK TUBE, turn the VALVE on and
press the ''REPL'' SWITCH for 13 seconds.
This is the amount of time film, 14 inches in length, causes the replenishment pump to operate.
[4]
Compare the average of 2 or more measurements with the film and chemical specifications of the
manufacturer.
[5]
If necessary, adjust the developer replenishment rate following the instructions on page 42.
[6]
Repeat for FIXER REPLENISHMENT rate.
246626
NOTE
NOTE
NOTE
41

Advertisement

Table of Contents
loading

Table of Contents