Moving the Processor Into Position
The processor weighs over 200 kg
(442 lb), therefore use 2 people when
installing the LEVELING SCREWS and
moving the processor into position.
[1]
Move the processor within approximately
2.5 cm (1 in.) of the wall.
[2]
Install the FLOOR PLATES.
[3]
Move the processor against the wall.
[4]
Check that the LIGHT-TIGHT GASKET is tight
against the wall. Compress the LIGHT-TIGHT
GASKET to approximately 10 mm (3/8 in.).
22
PROCESSOR
Figure 20 Positioning the Processor
LEVELING
SCREW
FLOOR
PLATE
Figure 21 Installing the Floor Plates
WALL
H108_0030ACA
H108_0030AA
2.5 cm (1 in.)
HEAD
H048_0141ACA
H048_0141AC
246626