5. Remove the ground cable screw and reinstall with the normal-phase grounding cable
attached. Make sure to lead cable along the front side of the diverter valve assembly
(→ Fig. 26).
Ground cable
screw
Tip: The carry-over volume of the normal-phase kit is the same as for the standard
configuration.
Operating Instructions
Fig. 26: Normal-phase ground strip
UltiMate 3000 Series:
AFC-3000 Automated Fraction Collector
Page 65