Thermo Scientific Dionex UltiMate 3000 Series Operating Instructions Manual page 37

Uhplc+ focused, automated fraction collector
Hide thumbs Also See for Dionex UltiMate 3000 Series:
Table of Contents

Advertisement

Important:
Important:
When installing funnel racks on the 21-position rack, connect tubing (shipped with the
rack) to each funnel and route the tubing to an appropriate container or bottle. Observe the
instructions for drain tubing (→ page 29).
Depending on the rack type, you can install a certain number of racks, deep well plates, or
bottles. The maximum number of racks and the order in which the racks must be placed
and configured in Chromeleon can be taken from table on page 31. The rack layout is
shown facing the front of the unit. Note that it is not allowed to install a rack, for example,
in position 2 if no rack is installed in position 1. For details on setting the racks in
Chromeleon, refer to section 5.2.3 (→ page 49).
Fraction rack
21Pos, 24Pos, 40Pos,
60Pos, 90Pos
36Pos_Foxy,
60Pos_Foxy,
72Pos_Foxy
96Pos_Foxy
Operating Instructions
Before loading or unloading any fraction racks on the universal drip
tray, move the arm with the drop former to the home position by
cycling the power off and on (or by sending the RinsePosition
comand). Never attempt to load, unload, or reposition a fraction rack
or fraction tube while the fraction collector is operating.
Avant de charger ou décharger aucun des racks de tubes de fraction
du plateau de fractions, parquez le bras avec le générateur des
gouttes en position d'origine par eteindre et allumer consécutivement
l'instrument (ou donner la RinsePosition commande). Jamais tentez
charger, décharger ou repositionner un des racks de tubes de fraction
ou un tube de fraction tandis que le collecteur de fraction est en
operation.
Maximum number of racks/bottles
Two racks can be installed on the universal
drip tray, holding the specified number of
tubes. Any two racks may be used together at
one time.
One Foxy rack can be installed on the
universal drip tray, holding the specified
number of tubes.
Two well plates (96 positions) can be installed
on the Foxy well plate holder.
UltiMate 3000 Series:
AFC-3000 Automated Fraction Collector
Rack layout
1
Rack 2
Page 31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afc-3000

Table of Contents