YASKAWA MOTOMAN-MPL80 II Instructions Manual page 50

Table of Contents

Advertisement

Table 9-1: Inspection Items (Sheet 1 of 2)
1)
Items
Schedule
1
Alignment mark
2
External lead
3
Working area and
manipulator
4
S, L, U, B, T-axes motor
5
Baseplate mounting bolts
6
Cover mounting screws
7
S, L, U, B, T-axes motor
connector
8
Connector base
9
Wire harness in manipulator
10 Battery pack in manipulator
• •
11 S-axis speed reducer
Method
Operation
Visual
Check alignment mark accordance at the home position.
Check for damage.
Visual
Check for damage and deterioration of leads.
Visual
Clean the work area if dust or spatter is present. Check for damage and
outside cracks.
Visual
Check for grease leakage.
Spanner
Tighten loose bolts. Replace if necessary.
Wrench
Screwdriver,
Tighten loose bolts. Replace if necessary.
Wrench
Manual
Tighten loose bolts.
Manual
Check for loose connectors.
Visual Multimeter
Check for conduction between the main connecter of base and intermediate
connector with manually shaking the wire.
Check for wear of protective spring
Replace it 24000H intervals.
Replace the battery pack when the battery alarm occurs or the manipulator
drove for 36000H.
Grease Gun
Check for malfunction. (Replace if necessary.)
Supply grease (6000H cycle)
Replace grease. (12000H cycle)
2)
3)
4)
5)
5)
. See section 9.3.2.
Inspection
Charge
• • •
• • •
• • •
• • •
• • •
• • •
• • •
• • •
• •
• •
• •
50 of 81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents