2.4 Preparing for Configuration and Commissioning

Revised June-2018
Once you have completed the wiring between the Field Link and the
ROC800 or FB107, re-attach the wire covers (on the ROC800) and
apply power to the ROC800 or FB107.
Proceed to Chapter 3.