Festo CPX-FB36 Instruction Manual page 25

Bus node network protocol ethernet/ip modbus tcp industrial ethernet 2-port
Hide thumbs Also See for CPX-FB36:
Table of Contents

Advertisement

1. Installation
Festo CPX-FB36-EN en 1611a English
Dismantling the bus node
1. Unscrew the screws.
2. Pull the bus node without tilting out of the interlinking
block.
Mounting the bus node
Note
Material damage due to incorrect mounting
Select screws that are suitable for the material of the
interlinking block:
– plastic: thread-cutting tapping screws
– metal: screws with metric thread.
1. Check seal and sealing surface. Replace damaged parts.
2. Push the bus node carefully and without tilting into the
interlinking block up to the stop.
3. Turn the screws into the existing thread.
4. Tighten the screws in diagonally opposite sequence.
Tightening torque: 1 Nm ± 10 %.
1-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents