• Lock the print heads:
Turn the two blue-green levers down-
wards.
• Take hose coupling of the hose connection
L
marked with
from stand-by position.
• Put hose coupling in left print head and
push in firmly. Feel the coupling lock in
place.
• Take hose coupling of the hose connection
R
marked with
from stand-by position.
• Put hose coupling in right print head and
push in firmly. Feel the coupling lock in
place.
Maintenance and care
111
Need help?
Do you have a question about the PostBase One and is the answer not in the manual?
Questions and answers