3 Mechanical Installation
Select the best possible operation site by considering the following (see details on the following pages, and the respective Design
Guides):
Ambient operating temperature
Installation method
How to cool the unit
Position of the frequency converter
Cable routing
3
Ensure the power source supplies the correct voltage and necessary current
Ensure that the motor current rating is within the maximum current from the frequency converter
If the frequency converter is without built-in fuses, ensure that the external fuses are rated correctly.

3.2.2 Receiving the Frequency Converter

When receiving the frequency converter please make sure that the packaging is intact, and be aware of any damage that might have occurred to the
unit during transport. In case damage has occurred, contact immediately the shipping company to claim the damage.

3.2.3 Transportation and Unpacking

Before unpacking the frequency converter it is recommended that it is located as close as possible to the final installation site.
Remove the box and handle the frequency converter on the pallet, as long as possible.
NB!
The card box cover contains a drilling master for the mounting holes in the D frames.
Illustration 3.2: Mounting Template
14
MG.11.O1.02 - ADAP-KOOL
®
is a registered Danfoss trademark
®
ADAP-KOOL
Drive AKD 102 High Power

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADAP-KOOL AKD 102 and is the answer not in the manual?

Questions and answers

Table of Contents