_____________________________________________________________________
Before testing preparation, read each note carefully.
Preparation for Testing
Setting Basic Testing Conditions
Testing
See 4.7 Testing with SWITCHED PROBE to conduct
NOTE
measurement using 9299 SWITCHED PROBE.
______________________________________________________________
Preparation for Testing
Connecting Power Cord
Powering On and Off the Unit
Connecting Cord and Probes
Using Handle
Connecting to Equipment to be tested
Chapter 2
See 2.1.
See 2.2.
See 2.3.
See 2.4.
See 2.5.
See Chapter 3.
See Chapter 4.
Preparation for Testing
7