Launching the acquisition
Inspect & clean all fiber connections prior connecting fiber
cables into the ports (BBU, distribution boxes, OVP and RRU/
RRH and SFP ports).
1
Press S
/S
TART
TOP
The red Test indicator goes on to show that the T-BERD/MTS is in
process of acquisition and the screen displays the trace in process
of acquisition.
2
The quality of the connection is displayed
for a few seconds (see
3
Then, a bar graph shows elapsed and remaining acquisition time.
Elapsed
Number of
acquisition time
averages calculated
Fig. 49
Acquisition in progress
At the end of the acquisition, a beep is emitted, the trace is
displayed and an automatic measurement is started.
NOTE
During acquisition, the traffic on fiber is automatically detected (see
"Traffic detection" on page
If the module possesses several lasers, to perform successive acquisi-
tions on all the wavelengths:
User Manual
770000102/08
Chapter 6 FTTA-SLM Software option
hard key to launch measurement.
Table 6 page
38)
Elapsed time
39)
Launching the acquisition
Total acquisition time
83