Final Checks - DEC 600 Installation And Service Manual

Network integration server
Table of Contents

Advertisement

11.5.16 Final Checks

Before powering up the system make sure that:
All communications cables are installed correctly. Refer to the Cabling
Instructions and Specifications card for each Network Interface Card.
The protective cover for the power module is installed.
All cards are seated correctly and connected to the backplane assembly.
Removing and Replacing Faulty Components 11–47

Advertisement

Table of Contents
loading

Table of Contents