This chapter describes how to power up and check the installed system.

4.1 Tasks

Follow the procedures in Sections 4.2 to 4.5 to:
1. Check the Network Interface Card installations
2. Power up the system
3. Monitor the power module LEDs
4. Monitor the system displays and LEDs
4.2 Check the Network Interface Card Installations
Before you power up the DECNIS 600, check that:
1. The Network Interface Cards are installed correctly and enabled.
2. The communications cables are installed correctly. Refer to the Cabling
Instructions and Specifications card for details of how to install the cables.