Initial Set-Up And Programming; Initial Set-Up; Programming - Bosch ICP-MAP5000-2 Installation Manual

Map 5000 series main panel intrusion alarm system
Hide thumbs Also See for ICP-MAP5000-2:
Table of Contents

Advertisement

58
en | Initial set-up and programming
4

Initial set-up and programming

4.1

Initial set-up

First check the following before initial set-up:
Notice!
Remove the protective dust cover label from the top of the power supply.
Final power connections
1.
2.
3.
4.
Warning!
Injury due to electricity
!
Risk of injury in the event of short circuit. Ensure the correct polarity!
Connecting the batteries
4.2

Programming

Programming is performed with the program RPS for MAP. A PC or laptop with Windows XP
SP3, Windows VISTA or Windows 7 is required for this. At least 256 MB RAM is needed. A
mouse is recommended for operation of the program.
2016.06 | 17 | F.01U.168.332
Are all cables connected correctly?
The power supply is always in operation after the AC mains has been connected and the
AC breaker switched on.
Switch the AC breaker on.
Ensure that there are no power-related trouble conditions.
Ensure that the AC LED indicator on the power supply turns on steady before you
connect the battery terminals to the power supply.
Connect the battery cable leads to the batteries and the power supply.
+
-
1
1
Installation manual
MAP 5000
Bosch Sicherheitssysteme GmbH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icp-map5000-com

Table of Contents