Suzuki Madura GV700GL Service Manual page 143

Table of Contents

Advertisement

• Install the oil seal into the final drive bevel
gear housing by using the special tool.
09913- 70122
Bearing installer
• Apply grease to the lip of oil seal.
99000-25030
SUZUKI super grease "A"
I
• Install the final drive coupling, washer and
nut.
I
CAUTION:
Always use a new nut.
• Tighten the nut to the specified torque by
using the special tool and torque wrench.
Tightening torque
09924- 64510
90-110N-m
( 9.0 - 11.0 kg-m)
(65.0- 79.5 lb-ft)
Final drive gear coupling
holder
• After the bearing pre-load has been adjusted to
the specification, remove the nut and apply
THREAD LOCK SUPER "1363A" to the nut
and tighten it to the specified torque.
• Bend the collar of the nut over into the notch in
the final drive bevel gear shaft.
• Liberally coat the final drive bevel gear coupling
splines with Lithium Base Molybdenum Grease
(NLGI
#
2), and install the propeller shaft coupl-
ing spring and propeller shaft coupling.
• Push the coupling in against the spring and
install the circlip by using the special tool.
09900-06108
Snap ring pliers
SHAFT DRIVE 4-28
**
"BEARING PRE-LOAD ADJUSTMENT" is
necessary by referring to page 4-31.
991 04 - 32030
Thread lock super "1363A"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents