Suzuki Madura GV700GL Service Manual page 111

Table of Contents

Advertisement

3-81 ENGINE SERVICING
• Remove the spring holder bolt
CD
and two
springs from the chain tensioner.
• Unlock the ratchet mechanism and fully push in
the push rod.
• Install a new gasket and the chain tensioner
adjuster to the front cylinder.
• Tighten the bolts to the specified torque.
Tightening torque
8-12
N·m
(0.8 - 1.2
kg-m)
(6.0- 8.5
lb-ft)
• Install the two springs®and tighten the spring
holder with washer to the specified torque.
Tightening torque
20-25
N-m
(2.0 - 2.5
kg-m)
(14.5 -18.0
lb-ft)
• Unlock the ratchet mechanism and push in the
push rod fully and while holding the push rod in
this condition tighten the end bolt @with
washer by turning it counter-clockwise. This end
bolt hold the push rod in position.
• Install a new gasket and the chain tensioner
adjuster to the rear cylinder.
• Tighten the bolts to the specified torque.
Tightening torque
8.0-12
N·m
(0.8 - 1.2
kg-m)
(6.0 - 8.5
lb-ft)
• Tighten the end bolt @ by turning it clockwise,
which release the push rod from the end bolt.
20-25
N·m
Tightening torque
(2.0 - 2.5
kg-m)
(14.5- 18.0
lb-ft)
CAUTION:
After installing
both
the tensioners, check
to be sure that both tensioners work properly
by checking the slack of timing chains.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents