Installing An Fjbu; Concluding Steps; Removing The Fjbu - Fujitsu PRIMERGY RX1330 M3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX1330 M3:
Table of Contents

Advertisement

Power supply unit (PSU)
6.4.1.3

Installing an FJBU

Figure 40: Installing an FJBU
Ê Push the FJBU into its bay as far as it will go until the locking latch snaps in
place.
V
CAUTION!
Ensure that the FJBU properly engages in its bay and is locked in
position in order to prevent it from sliding out of the chassis during
transportation.
6.4.1.4

Concluding steps

Ê No steps needed.
I
To execute auto shutdown after power fail, you should install the FJBU
management software. How to install and configure the FJBU
management software, please refer to the "Fujitsu Battery Unit" user
guide.
6.4.2

Removing the FJBU

Customer Replaceable Unit
(CRU)
Tools: tool-less
Note for servers using CMA (Cable Management Arm)
Regarding of removing the FJBU, additional tasks are needed, due to an
interference between CMA stopper and the FJBU.
122
Upgrade and Maintenance Manual
Hardware: 5 minutes
RX1330 M3

Advertisement

Table of Contents
loading

Table of Contents