Chapter 3: System planning
This chapter provides information to help the user to plan a PTP 650 link.
The following topics are described in this chapter:
•
Typical deployment
deployments.
•
Site planning
on page
end sites, including grounding, lightning protection and equipment location.
•
Radio spectrum planning
regulatory restrictions that apply in the country of operation.
•
Link planning
on page
such as range, path loss and throughput.
•
Planning for connectorized units
planning to use connectorized ODUs with external antennas in PTP 650 links.
•
Data network planning
data networks.
•
Network management planning
managed remotely using SNMP.
•
Security planning
on page
mode.
•
System threshold, output power and link loss
system threshold (dBm), output power (dBm) and maximum link loss (dB) per channel
bandwidth and modulation mode.
•
Data throughput capacity tables
calculation of the data rate capacity that can be provided by PTP 650 configurations.
on page
3-2
contains diagrams illustrating typical PTP 650 site
3-8
describes factors to be considered when planning the proposed link
on page
3-16
describes how to plan PTP 650 links to conform to the
3-21
describes factors to be taken into account when planning links,
on page
3-25
on page
3-27
describes factors to be considered when planning PTP 650
on page
3-31
3-33
describes how to plan for PTP 650 links to operate in secure
on page
3-47
Page
describes factors to be taken into account when
describes how to plan for PTP 650 links to be
on page
3-41
contains tables that specify the
contains tables and graphs to support
3-1