Connectorized Odu - Cambium Networks PTP 650 Series User Manual

Table of Contents

Advertisement

Chapter 5: Installation

Connectorized ODU

1 (a) Line up the bolt heads with receptacles in the ODU. (b) Fix the mounting plate and bracket
bolts to the back of the ODU using the bolts and washers. Tighten to a torque setting of 5 Nm (4
lb ft).
(a) Receptacles for bracket bolts:
2 Hoist the ODU up to its position on the mounting pole.
3 (a) For back-to-back LPU mounting, fix the ODU to the pole using the LPU.
(b) For separate LPU mounting, fix the ODU to the pole using the bracket strap.
(c) Back-to-back LPU:
4 Tighten the mounting bolts to a torque setting of 7 Nm (5.5 lb ft). Do not over-tighten the bolts,
as this may lead to failure of the assembly.
(b) Mounting plate fixed:
(d) Separate LPU:
Page
5-9
Installing the ODU and top LPU

Advertisement

Table of Contents
loading

Table of Contents