[L2_SwitchA-Ethernet1/1] port link-type hybrid
[L2_SwitchA-Ethernet1/1] port hybrid vlan 11 tagged
[L2_SwitchA-Ethernet1/1] port hybrid vlan 100 untagged
3.
Configure Layer 2 Switch B:
# Configure Ethernet 1/2 as a trunk port, and assign the port to VLAN 11 and VLAN 100.
<L2_SwitchB> system-view
[L2_SwitchB] interface ethernet 1/2
[L2_SwitchB-Ethernet1/2] port link-type trunk
[L2_SwitchB-Ethernet1/2] port trunk permit vlan 11 100
# Enable basic QinQ on Ethernet 1/2, and configure the port to add a outer VLAN tag 100 to
packets tagged with VLAN 11.
[L2_SwitchB-Ethernet1/2] qinq enable
[L2_SwitchB-Ethernet1/2] qinq vid 100
[L2_SwitchB-Ethernet1/2-vid-100] raw-vlan-id inbound 11
[L2_SwitchB-Ethernet1/2-vid-100] quit
[L2_SwitchB-Ethernet1/2] quit
# Configure Ethernet 1/1 as a trunk port, and assign the port to VLAN 100.
[L2_SwitchB] interface ethernet 1/1
[L2_SwitchB-Ethernet1/1] port link-type trunk
[L2_SwitchB-Ethernet1/1] port trunk permit vlan 100
4.
Configure Router:
# Create Ethernet subinterface GigabitEthernet 4/0/1.10, and assign an IP address to the
subinterface.
<Router> system-view
[Router] interface GigabitEthernet 4/0/1.10
[Router-GigabitEthernet4/0/1.10] ip address 1.1.1.11 255.255.255.0
# Enable QinQ termination on GigabitEthernet 4/0/1.10, and configure the subinterface to
terminate the VLAN-tagged packets whose Layer 1 VLAN tag is 100 and Layer 2 VLAN tag is 11.
[Router-GigabitEthernet4/0/1.10] vlan-type dot1q vid 100 second-dot1q 11
[Router-GigabitEthernet4/0/1.10] quit
# Assign an IP address to GigabitEthernet 4/0/2.
[Router] interface GigabitEthernet 4/0/2
[Router-GigabitEthernet4/0/2] ip address 1.1.2.11 255.255.255.0
5.
Use the factory configuration of Layer 2 Switch C.
Ambiguous QinQ termination configuration
example

Network requirements

As shown in
to VLAN 1 1, VLAN 12, and VLAN 13, respectively. The server group is connected to Layer 2 Switch C.
QinQ is enabled on Layer 2 Switch B.
Configure QinQ termination, so that Host A, Host B, and Host C can communicate with the server group.
Figure
61, Host A, Host B and Host C are connected to Layer 2 Switch A and they belong
171