GE G60 Instruction Manual page 229

Ur series generator management relay
Hide thumbs Also See for G60:
Table of Contents

Advertisement

5 SETTINGS
The split phase element principle of operation is as follows. First, define the following parameters:
I
: split-phase current, I
split
Then, the expected value of the steady state unbalance (defined as bias current) is expressed as follows:
where:
slope
and offset is the split phase current at no-load. In "Over" mode, the element will pickup if:
In "Over-under", mode, the element will pickup if:
GE Multilin
830728A1.CDR
Figure 5–73: SPLIT PHASE PROTECTION FOR 2 CTS
830727A1.CDR
Figure 5–74: SPLIT PHASE PROTECTION FOR 1 CT
: load current, pickup: pickup setting, min_load: minimum load supervision setting
load
×
I
slope I
=
bias
load
I
Load CT Primary
split
---------- -
×
---------------------------------------------------- -
=
I
Load CT Secondary
load
(
I
I
>
pickup
)
and
split
bias
(
>
)
I
I
pickup
and
split
bias
G60 Generator Management Relay
Split Phase
Load
Source
Source
Split Phase
Load
Source
Source
offset
+
Split Phase CT Secondary
×
--------------------------------------------------------------------- -
Split Phase CT Primary
(
I
min_load
)
load
(
)
I
min_load
load
5.5 GROUPED ELEMENTS
(EQ 5.24)
(EQ 5.25)
(EQ 5.26)
(EQ 5.27)
5-131
5