Prepare To Isolate Loading Pressure; Isolate Loading Pressure (1) - Fresenius Medical Care 2008T Troubleshooting Manual

Hemodialysis system
Hide thumbs Also See for 2008T:
Table of Contents

Advertisement

CLEAN- 1.2.1 PREPARE TO ISOLATE LOADING PRESSURE
Figure right
a)
, remove the ACID (RED)
connector from the acid inlet tubing AND
attach the Loading Pressure gauge tubing to
it.
ENSURE
b)
the gauge reads 0 psi before inserting it
in the Rinse Port!
c) Place the Acid Inlet tubing into water.
d) Figure below, SLAM the acid connector, with the
gauge now attached, into the Acetate/Acid Rinse
port.
e) See procedure number
CLEAN- 1.2.1.1 ISOLATE LOADING PRESSURE (1)
a) Figure right, if the "Interrupted" banner IS NOT up
continue to part b. If "Interrupted" is up press 'Esc',
then depending on where the Flow Error was occurring, return HEAT DISINFECT OR RINSE!
b) ENSURE no leaks at the gauge!
c) Figure right, TWO (2) possible scenarios:
1)
IF equipped with the bibag
Connector: See procedure number
CLEAN- 1.2.2
2)
IF (and ONLY if) NOT equipped with a
bibag Connector: Proceed to
173
, procedure number
CLEAN- 1.2.1.1
(page 171).
(page 172).
page
CLEAN-
1.2.3.
2008T Troubleshooting Guide
P/N 490292 Rev. A
Page 171

Advertisement

Table of Contents
loading

Table of Contents