GE AKTA start Maintenance Manual page 87

Hide thumbs Also See for AKTA start:
Table of Contents

Advertisement

Step
7
ÄKTA start Maintenance Manual 29060308 AD
Action
Once the firmware is updated, perform the following calibration sequence:
Display:Touch screen calibration
Pressure sensor:Zero offset
Pump : Calibration:Flow rate
UV:UV LED calibration
Conductivity:Advanced calibration (temperature sensor calibration)
Conductivity:Calibration (flow cell calibration)
3 Maintenance operations
3.14 System
3.14.1 Firmware update
87

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA start and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF