GE AKTA start Maintenance Manual page 42

Hide thumbs Also See for AKTA start:
Table of Contents

Advertisement

3 Maintenance operations
3.5 UV Monitor
3.5.2 Diagnostics
Step
3
4
5
Check for presence of stray light
Follow the instructions below to perform a Stray light test.
Step
1
42
Action
Tap Diagnostics.
Result: The Diagnostics screen opens.
Tap Set baseline to capture a new reference value for the test.
Tap Dark current test.
The result is displayed as Pass or Fail:
Pass: the UV Monitor is working as it should.
Fail: replace the UV Monitor.
Action
Flush and fill the UV flow cell with 15% acetone using a syringe. Make sure
that there are no air bubbles in the syringe.
ÄKTA start Maintenance Manual 29060308 AD

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents