GE AKTA start Maintenance Manual page 51

Hide thumbs Also See for AKTA start:
Table of Contents

Advertisement

Step
3
4
5
6
ÄKTA start Maintenance Manual 29060308 AD
Action
Use the up/down arrows to set the desired Flow Rate.
Tap Start flow to start the Pump.
Collect water for at least one minute in the pre-weighed collection tube.
Tap Stop flow to turn the Pump OFF.
Weigh the pre-weighed collection tube containing the collected water
and calculate the volume of the pumped water, then set the Collected
Volume value equal to this volume.
Tap Calibrate.
Result: The following screen opens.
Wait while the calibration is running. The calibration is done when the Cali-
bration screen re-opens.
3 Maintenance operations
3.6 Pump
3.6.1 Calibration
51

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA start and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF