5.3
UV
Required tools
Tool
Torx screwdriver
Instructions
Follow the instructions below to remove and replace the UV Monitor.
Step
1
2
ÄKTA start Maintenance Manual 29060308 AD
WARNING
Disconnect power. Always switch off power to the instrument be-
fore replacing any component on the instrument or cleaning the
instrument, unless stated otherwise in the user documentation.
Action
Switch off the instrument by pressing the Power Switch to the O position.
Remove the inlet and outlet tubing from the ports.
5 Removing and replacing modules
Dimension
T20
5.3 UV
117
Need help?
Do you have a question about the AKTA start and is the answer not in the manual?
Questions and answers