GE AKTA start Maintenance Manual page 120

Hide thumbs Also See for AKTA start:
Table of Contents

Advertisement

5 Removing and replacing modules
5.3 UV
Step
6
7
120
Action
Remove the UV Monitor and leave the RJ45 connector as it is.
Connect the RJ45 connector to the new UV monitor.
Note:
Make sure that there is a click sound when the RJ45 connector is connected.
The UV monitor may not work properly if the RJ45 connector is not properly
connected.
ÄKTA start Maintenance Manual 29060308 AD

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents