Required server components and most options are installed at the factory. However, some
ordered options might be packaged separately. If possible, install optional components before
installing the server in a rack. For instructions for installing server options, see
Component Installation" on page

Tools and Equipment Needed

To install the system, you need the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
You also need a system console device, such as one of the following:
Workstation
ASCII terminal
Terminal server
Patch panel connected to a terminal server

ESD Precautions

Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wrist strap, foot strap, or equivalent safety equipment to prevent electrostatic damage (ESD)
when you install or service the server.
Caution -
which can permanently disable the system or require repair by authorized service technicians,
place components on an antistatic surface, such as an antistatic discharge mat, an antistatic bag,
or a disposable antistatic mat. Wear an antistatic grounding strap connected to a metal surface
on the chassis when you work on system components.
Description
RJ-45 to DB-9 crossover adaptor
Printed documents
2 AC power cords
32.
Equipment damage. To protect electronic components from electrostatic damage,
Tools and Equipment Needed
"Optional
Preparing to Install the Server
31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun Server X4-4 and is the answer not in the manual?

Questions and answers

Table of Contents