Oracle Sun Server X4-4 Installation Manual page 51

Hide thumbs Also See for Sun Server X4-4:
Table of Contents

Advertisement

Callout
Description
1
Power supply 0 AC inlet connector with cable clip
2
Power supply 1 AC inlet connector with cable clip
A two-CPU system will operate from low-line 100 to 127 VAC or high-line 200 to 240
Note -
VAC sources. A four-CPU system will only operate from high-line 200 to 240 VAC sources.
1.
Connect two grounded server power cords to grounded electrical outlets.
Connect the two server power cords to the AC connectors on the back panel
2.
of the server [1and 2 in the previous figure] and secure each cord using the
connector's cable clip.
When power is connected, the server boots into standby power mode:
The SP OK indicator [2] flashes while the SP is starting, and the system OK indicator [1]
remains off until the SP is ready.
Connect the Power Cords
Cabling the Server
51

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun Server X4-4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents