Access Route Guidelines - Oracle SuperCluster T5-8 Owner's Manual

Table of Contents

Advertisement

Preparing the Unloading Route and Unpacking Area
Note -
to stand unopened in the computer room or a similar environment to come to the same
temperature as the computer room. Acclimatization might require up to 24 hours.
Related Information
"Shipping Package Dimensions" on page 111
"Access Route Guidelines" on page 112
"Unpacking Area" on page 113
"Physical Specifications" on page 96

Access Route Guidelines

Leave the server in its shipping container until it reaches its final destination.
Plan the access route to enable smooth transport of the system. The entire access route to the
installation site should be free of raised patterns that can cause vibration. Avoid obstacles such
as doorways or elevator thresholds that can cause abrupt stops or shocks, and the route must
meet the following requirements.
Access Route Item
Minimum door height
Minimum door width
Minimum elevator depth
Maximum incline
Minimum elevator, pallet jack, and floor loading
capacity (Shipping weights, see
Package Dimensions" on page
Related Information
"Shipping Package Dimensions" on page 111
"Loading Dock and Receiving Area Requirements" on page 111
112
Oracle SuperCluster T5-8 Owner's Guide • May 2016
Acclimatization time: If the shipping package is very cold or hot, allow the packaging
"Shipping
111)
With Shipping Pallet
2184 mm
(86 in.)
1220
(48 in.)
1575 mm
(62 in.)
6 degrees
1134 kg
(2500 lbs)
Without Shipping Pallet
2000 mm
(78.74 in.)
600 mm
(23.62 in.)
1200 mm
(47.24 in.)
6 degrees
1134 kg
(2500 lbs)