Connecting The Union Tee To The Ion Source - Thermo Scientific LCQ Fleet Getting Started Manual

Ltq series
Table of Contents

Advertisement

Connecting the Union Tee to the Ion Source

Figure 31. Plumbing diagram showing APCI/MS sample introduction with high-flow infusion
From LC pump outlet to port 2
From port 3 to TEE
From syringe to TEE
Thermo Scientific
To connect the union Tee to the ion source
1. Using a fingertight fitting and a ferrule, connect one end of a length of red PEEK tubing
to the union Tee.
Figure 31
2. Depending on whether you are using the ESI probe or the APCI probe, do one of the
following:
• For the APCI probe, use a fingertight fitting and a ferrule to connect the other end of
the tubing directly to the sample inlet of the APCI probe.
connection between the union Tee and the sample inlet of the APCI probe.
Note Do not use the grounding bar of the Ion Max-S API source for the APCI
probe. A knurled nut secures the grounding bar to the Ion Max-S ion source. You
do not need to remove the grounding bar to run the system in the APCI mode.
From TEE
to sample inlet
of APCI probe
• For the ESI probe, use a fingertight fitting and a ferrule to connect the other end of
the tubing to the grounding union that is held by the grounding bar of the Ion
Max-S API source. See
The grounding union slides into the grounding bar on the Ion Max-S API source as
shown in
Figure 38
to the ESI probe sample inlet, refer to the Ion Max and Ion Max-S API Source
Hardware Manual.
shows the connections to the union Tee.
From port 1 to waste container
Figure 32
and
Figure
on
page
55. For instructions on connecting the grounding union
6
Connecting the Inlet Plumbing
Setting Up the Inlet for High-Flow Infusion
Figure 31
shows the
33.
LTQ Series Getting Connected Guide
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ltq xl maldiLtq xlLxq

Table of Contents