Thermo Scientific LCQ Fleet Getting Started Manual page 68

Ltq series
Table of Contents

Advertisement

6
Connecting the Inlet Plumbing
Setting Up the Inlet for an LC/MS System with an Autosampler
Figure 37. Plumbing connections for introducing sample from an autosampler into an ESI/MS system
A
B Wash
54
LTQ Series Getting Connected Guide
C
D
Power
Comm
Run
Temp
3. To connect port 3 of the divert/inject valve to the ion source, depending on the probe
type, do one of the following:
• For the ESI probe, use two fingertight fittings and two ferrules to connect a length of
red PEEK tubing between port 3 of the divert/inject valve and the grounding union.
To connect the other end of the grounding union to the ESI probe sample inlet,
follow the instructions in the Ion Max and Ion Max-S API Source Hardware Manual.
• For the APCI probe, use two fingertight fittings and two ferrules to connect a length
of red PEEK tubing between port 3 of the divert/inject valve and the APCI probe
sample inlet.
4. To connect the divert /inject valve to a waste container
• Using a fingertight fitting and a ferrule, connect one end of a length of red PEEK
tubing to port 1 of the divert/inject valve.
• Place the other end of the tubing to an appropriate waste container.
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ltq xl maldiLtq xlLxq

Table of Contents